Chassis 1
8-May-2005
Rolling chassis shots. The frame is done as well as
the spring rigging and the equalization. Some of the brake rigging is
also complete. Only two of the wheels ane complete and are on wooden
axels. The Dirving Boxes are wood as well. Soon after these were taken,
I started to machine steel tires for the drivers.