Side Rods 24
29-Dec-2006
The setup for machining the top and bottom bosses. The top one is for the oil cup, and the bottom one is for the bearing retainer (just a decorative screw in this case).
The pin (expanding mandrel) holds the end being machined, and the other end is held up by a clamp rod (rear view).